Our work in practice

Our work in practice
Home >

Cases

  1. Uninterrupted 120-Hour Test

    Long-duration tests carry a specific type of risk. Over 120 continuous hours (5 days), thermal variations and electrical oscillations can invalidate a test and/or commissioning. There is no room for interruption or correction in the middle of the process, much less equipment failure. When the window begins, it must be completed — any deviation invalidates […]

    More
  2. Equipment Adaptation for Test Environment

    In Data Center commissioning, the test itself is already complex. What intensifies the challenge is operation within the room — an environment that often imposes limitations making each step more sensitive and less predictable. Limited space, controlled airflow, restricted routes, and constant movement needs create a practical challenge: equipment may have the right capacity but […]

    More
  3. Test Execution in Non-Consolidated Environment

    In some projects, the challenge isn’t the load or test methodology, but the conditions of the location where it needs to happen. In this case, the room was still under construction when the client needed to advance with commissioning. The contractual deadline was rigid, and failure to perform the test would result in fines and […]

    More
  4. Emergency Replacement in Critical Operation

    In mission-critical environments, test continuity depends on both infrastructure and the reliability of the equipment applying the load. In this project, operation was interrupted early — the load bank contracted from another company suffered a serious incident (a fire hazard). The commissioning window was open, the team was already mobilized, and the interruption jeopardized the […]

    More
  5. Offshore Operation in Severely Restricted Environment

    Offshore projects present limitations nonexistent in terrestrial environments. Access is restricted, logistics are slow, space is limited, and any adjustment requires precise coordination among multiple teams. Executing a load test under these conditions means dealing with long routes, specific anchor points, and safety requirements making each step more complex than in a conventional Data Center. […]

    More
  6. Technical Delivery Test in Restricted Access Environment

    In some projects, the challenge isn’t the applied power, but how to deliver that power to where it needs testing. At Albert Einstein Faculty construction, the operation required a 13.8 kV test with generators installed in the seventh basement — a room completely sealed for noise and heat containment. This characteristic, essential for the project, […]

    More
  7. Development of Specific Equipment for Data Center Commissioning

    Data Center commissioning imposes technical requirements beyond load application. Installation, cable routing, available connection types, and room physical space directly influence test viability. In many projects, the obstacle isn’t just the system being validated, but how the load bank must operate within an environment that is, by nature, complex, restricted, and sensitive. From accumulated experience […]

    More
  8. Automation of Large-Scale Sudden Load and Unload Testing

    In Data Center commissioning operations, there are scenarios where the challenge isn’t just applied power, but test dynamics. Some protocols require abrupt variations — 0 to 100% and 100% to 0 — to validate system response to instantaneous load changes. It’s a sensitive, repetitive process needing to occur simultaneously across dozens or hundreds of equipment. […]

    More